One more concrete plant starts operation for a wind farm, the model is CWS for 90 m³/h with 02 cement silos and aggregates load system that avoid ramp for the loader.

The equipment is installed in the Wind Farm Santa Luzia-PB and is responsible for the production of the bases from generators towers, each base needs about 400 m³ of concrete with high technologic control.

Lintec-Ixon has consolidated as a reference in this segment where the quality of the concrete produced is extremely high and the production for each base must be uninterrupted. Actually many wind farms are been building with Lintec-Ixon concrete plants, from the south region to the northeast of Brazil.

Contact us and consult the right solution for your work profile.